Quarklab: Private EVM Drainer
Quarklab Crypto Drainer Supports Over 480+ Popular Wallets
Quarklab Drainer stealth mode bypassing MetaMask and Blockaid warnings
Quarklab Drainer pricing plans and available packages for crypto professionals
QUARK DRAINER

Quark EVM Drainer for MetaMask & TrustWallet

50+ Chains. 100+ Protocols. 250+ EVM Wallets.
Ethereum, Arbitrum, Base, Blast, zkSync 

From staked ETH to Blur LPs – drained in one signature

PRIVATE COMMUNITY ACCESS
GUIDES & ARTICLES
ONGOING TECHNICAL SUPPORT & UPDATES
LOW FLAG RATE
QUICK SETUP
ADVANCED ADMIN PANEL

How EVM Drainer Works

Connect Wallet

Users see modal window where they connect their Ethereum wallet (MetaMask, Exodus TrustWallet, Trezor, Coinbase etc). This grants the script access to their assets.

Quarklab Drainer works on EVM, Solana, TRON, XRP, and 90+ blockchain networks
Quarklab Drainer pricing plans and available packages for crypto professionals

Asset Identification & Fake Transaction

Customize a fake transaction which pop ups for a victim. Once connected, the drainer scans the wallet for high-value assets, prioritizing ETH, stablecoins (USDT, USDC), and NFTs. It identifies which assets can be drained based on withdrawal methods.

Draining Execution

Using optimized logic, the drainer initiates the transfer of identified assets to your designated wallet address. The process is fast, secure, and designed to avoid triggering red flags.

Quarklab Drainer real-time tracking dashboard showing wallet balances and transaction history
EVM Drainer dashboard interface showing real-time tracking and analytics

Real-Time Notifications

As soon as a transaction is completed, you receive an instant alert via Telegram. Additionally, detailed logs are available in the admin panel for monitoring and analysis.

Full asset extraction - from staked ETH to NFT LP positions

Drain Every Layer of the Wallet

DEFI VAULTS & LENDING
  • AAVE v2 / v3
  • Venus, Radiant, Spark
  • EigenLayer (restaked ETH)
  • Prisma Finance
  • MakerDAO Vaults
  • ApeStake (APE + NFTs)
  • LayerBank, Granary
  • Morpho Blue
DEX & LP Positions
  • Uniswap V2 / V3
  • PancakeSwap, SushiSwap
  • Curve.fi + Convex
  • Trader Joe (ERC1155 LPs)
  • Camelot V2 LPs
  • Velodrome / Aerodrome
  • Stargate, Frax LPs
  • Beefy Finance Vaults
Implementation
  • Blur Marketplace + Pools
  • Seaport
  • ERC404 (hybrid tokens)
  • Permit & Permit2
  • Session Keys
  • Native staking (Blast, EigenLayer)
  • Pendle Finance (PT/GLP)
  • 50+ additional DeFi protocols

Works across 250+ EVM Wallets

Metamask, Rabby, Trust Wallet, Coinbase Wallet, OKX Wallet, Bitget Wallet, SafePal, TokenPocket, Zerion, Argent, Rainbow, 1inch Wallet, imToken, MathWallet, Exodus, Atomic Wallet, Frame, Taho, Portis, Torus, Nifty, Opera Crypto Browser, Ledger, Trezor, Keysxrpe, XDEFI, Zengo, Ambire, Pillar, Sequence, Unstoppable Wallet etc.

Key Features

Instant Multi-Chain Sweep

No more manual switching between networks. The drainer detects all EVM chains where the victim holds assets – Ethereum, Arbitrum, Base, Blast, zkSync, and 50+ others – and executes parallel draining transactions in a single session. Staked ETH on EigenLayer, LP tokens on Uniswap V3, Native yield on Blast.

Stealth Mode

Modern wallets like Trust Wallet and MetaMask flag high-risk transactions. Quark drainer uses obfuscated proxy contracts, split transaction logic, and Permit2 abuse to disguise the drain as a harmless “approval” or “claim”. Fake UI prompts (+0.5 ETH reward) further reduce suspicion. Even advanced protections like Wallet Guard or Blockaid fail to detect the payload.

Real-Time Dashboard

Track every hit in live time:

  • Victim’s wallet address & device type
  • Chains drained & asset breakdown (ETH, USDC, NFTs, LPs)
  • Estimated USD value per hit
  • Traffic source (UTM tracking)

Auto-Convert to ETH

Why keep 20 random tokens? Our built-in DEX aggregator instantly swaps all drained assets to ETH or WETH at the best available rate. All transactions use EIP-1559 for predictable pricing. You receive clean ETH.

Deploy the most effective EVM Drainer in 2026

Quark Drainer is the only tool that automatically extracts 90+ chains from MetaMask, Trust Wallet, Coinbase, and all “Wallet Connect” wallets

Includes 400+ ready-made landers, fake/stealth transaction, real-time Telegram alerts, and 24/7 support

Price: $5,000

Quark Drainer

Quark Drainer supports wallets on Ethereum, Solana, TRON, and XRP platforms

Supported networks collectively account for over 90% of all blockchain transaction activity

FREQUENTLY ASKED QUESTIONS

Have questions about Quark EVM Drainer? We’ve compiled answers to the most common queries to help you understand its features, functionality, and how it can work for you.

Does it drain staked or locked assets?

Yes – and this is where the real profit is. We extract:

  • EigenLayer restaked ETH and eTokens
  • Blast native yield (auto-claimed)
  • AAVE v3 collateral (even if borrowed against)
  • Convex and Curve LP + gauge rewards
  • Prisma and Spark vault positions
    The drainer doesn’t just take what’s liquid – it unlocks every yield-bearing position the wallet has approved.
Can I use my own frontend or integrate into an existing page?

Absolutely. You get a single JS snippet (under 10KB) that you inject into any HTML page – your airdrop site, fake KYC portal, or NFT mint. The script loads silently, connects to our draining engine, and activates on wallet interaction. Full control over design, copy, and UX.

How does Permit2 exploitation work?

Permit2 allows unlimited token approvals with a single signature. Quark drainer tricks users into signing a malicious Permit2 authorization that grants us infinite spending rights across all tokens. Once signed, we can drain any ERC20 without further interaction. This bypasses traditional approval limits and works across all chains supporting Permit2.

What’s the success rate on wallets with security plugins?

Over 85% on Phantom, MetaMask, and Coinbase Wallet – even with Blockaid, Wallet Guard, or Fire enabled. We use:

  • Fake transaction previews (“You’ll receive 0.2 ETH”)
  • Delayed execution (300ms after signature)
  • Contract obfuscation (no known malicious addresses)
    Most users don’t read popups – and security plugins often miss novel payloads.
Can I rotate payout addresses per campaign?

Yes. Set a different ETH address for each domain or traffic source via our dashboard. Use burner wallets, Tornado Cash deposits, or multi-sig vaults. Addresses can be updated in real time – no redeployment needed.

Does it support NFTs and ERC1155?

Fully. We drain:

  • ERC721 (BAYC, Azuki, Pudgy)
  • ERC1155 (Sandbox, Gods Unchained, Trader Joe LPs)
  • ERC404 (hybrid tokens like Pandora)
  • Blur Points and Seaport listings
    NFTs are either sent directly to your wallet or auto-listed on Blur for instant liquidity.
How fast is the full drain?

Typically 2–4 seconds from signature to final ETH in your wallet. The process:

  1. User signs fake “claim”
  2. Permit2 approval + native token sweep (0.5s)
  3. LP/DeFi position unwrapping (1–2s)
  4. Swap to ETH (1s)
    Most victims only realize something’s wrong when they see their balance drop.
Can I run multiple campaigns at once?

Yes. The dashboard supports unlimited campaigns. Track performance per:

  • Domain 
  • Traffic source
  • Geo (via IP detection)

    Each campaign can have its own frontend, payout address, and Telegram alert rules.

How is this different from cheap drainers on Telegram?

Most “drainers” are basic ERC20 scrapers. Ours is a full-stack DeFi exploitation suite:

  • Drains 50+ protocols, not just tokens
  • Bypasses modern wallet protections
  • Includes auto-convert and analytics
  • Updated weekly for new protocols
  • 24/7 support